PROFESSIONAL STUDIES BUILDING
Total Cost: $1.2 Million
ADA Improvements
Restroom ADA Upgrades
Energy Efficiency
HVAC System Replacement
HVAC/Comfort
HVAC Controls Replacement
VODRA HALL
Total Cost: $2.5 Million
Life/Safety
Fire Alarm Upgrade
Energy Efficiency
HVAC System Replacement
Lighting Upgrades
Flush Valves
HVAC/Comfort
HVAC Controls Replacement
Building Envelope
Façade Repairs
Door/Window Replacements
Building Infrastructure
Domestic Water System Upgrades
JOHN J. MOORE ATHLETICS AND FITNESS CENTER
Total Cost: $828,000
Life/Safety
Fire Alarm System Upgrades
Energy Efficiency
Lighting Replacement
Flush Valves
HVAC/Comfort
HVAC Controls Upgrade
Building Envelope
Window/Skylight Replacements
HEPBURN HALL
Total Cost: $6.7 Million
Life/Safety
Emergency Generator Replacement
Sprinkler System Install
ADA Improvements
Restroom ADA Upgrades
Energy Efficiency
HVAC System Replacement
Lighting Upgrades
HVAC/Comfort
HVAC Controls Replacement
Building Envelope
Roof/Door Replacements
Building Infrastructure
Electrical System Upgrades
GILLIGAN STUDENT UNION BUILDING
Total Cost: $9 Million
Life/Safety
Emergency Generator Replacement
Entrance Ramp Replacement
Building Envelope
Roof Replacement
Deck/Plaza Restoration
Parking Garage Restoration
Repair Water Infiltration
Building Infrastructure
Electrical System Improvements
SCIENCE BUILDING
Total Cost: $7.8 Million
Life/Safety
Emergency Generator Replacement
Fire Alarm System Upgrades
ADA Improvements
Restroom ADA Upgrades
Energy Efficiency
HVAC System Replacement
Electrical System Upgrades
HVAC/Comfort
HVAC Controls Replacement
Building Envelope
Façade Repairs
Exterior Door Replacements
Building Infrastructure
Domestic Water System Upgrades